91插插影库-日本成人区-日本91在线-www日本视频-国产欧美一区二区精品忘忧草-2018天天操-久久草av-亚洲视频在线网站-九九午夜视频-超碰加勒比-人妻色综合网站-久久一级片免费看-亚洲自拍天堂-国产成人av一区二区三区-日本免费不卡的一区视频-与子敌伦刺激对白播放的优点-国产伦精品一区二区三区

Welcome to the official website of Wuxi Chenna Machinery Co., Ltd. (Changzhou Chenna Hydraulic Machinery Co., Ltd.)!
LANGUAGE:CNEN
Precision piston rod

Professional Sincere Honest Win-win

HOTLINE:

+86-158 9532 0613

Hydraulic cylinder precautions

First, in order to prevent the bending or deformation of the elongated member such as the piston rod, the balance of the support is applied when placed. During the disassembly, the piston rod top thread, the port thread and the piston rod surface, the inner wall of the cylinder liner, etc. should be prevented from being damaged.

Second, the disassembly should be carried out in order. Due to the different structure and size of the various hydraulic cylinders, the disassembly sequence is slightly different. Generally, the oil in the two chambers of the cylinder should be drained, then the cylinder head should be removed, and the piston and piston rod should be removed. When disassembling the cylinder head of the hydraulic cylinder, special tools should be used for the key or the snap ring of the inner card type connection. It is forbidden to use the flat shovel; for the flange type end cover, it should be screwed out, no hammering or hard smashing is allowed. . When the piston and the piston rod are difficult to extract, do not force it out. You should first find out the cause and then disassemble it.

Third, before and after unloading, try to create conditions to prevent the parts of the hydraulic cylinder from being contaminated by dust and impurities around. For example, when disassembling, try to carry out in a clean environment; after disassembly, all parts should be covered with plastic cloth, not covered with cotton cloth or other work cloth.

Fourth, the cylinder should be carefully checked after disassembly to determine which parts can continue to be used, which parts can be repaired before use, and which parts should be replaced.

Fifth, carefully clean the parts before assembly.

Sixth, when the threaded coupling is tightened, a special wrench should be used, and the torque should meet the standard requirements.

Seventh, after assembling the piston and the piston rod, it is necessary to try to measure whether the concentricity and the straightness over the entire length are out of tolerance.

Eighth, after the assembly, the piston assembly should be moved without any obstruction and uneven resistance.

Ninth, when the hydraulic cylinder is installed on the main machine, a sealing ring should be added between the inlet and outlet port joints and fastened to prevent oil leakage.

2019/09/25 10:12:00 4678 次


Related Documents
Copy right ? 2019 Wuxi Chenna Machinery Co., Ltd.(Changzhou Chenna Hydraulic Machinery Co., Ltd.) All rights reserved.
苏州市| 互助| 建宁县| 兴安盟| 门头沟区| 汝城县| 崇信县| 宝清县| 开江县| 金川县| 南木林县| 东光县| 盈江县| 新昌县| 华安县| 高清| 抚宁县| 南通市| 夏邑县| 辽阳县| 志丹县| 六盘水市| 武冈市| 商南县| 丹巴县| 宁阳县| 宜兰市| 同仁县| 芦山县| 理塘县| 南澳县| 鹤壁市| 廉江市| 汾阳市| 西乌| 保亭| 蓬溪县| 中江县| 冕宁县| 绵阳市| 莫力|